A dialogue between old and new was developed using a material palette of natural, raw finishes inspired by traditional Welsh practices. Floors are buffed concrete, a modern take on traditional flagstones whilst the untreated larch cladding was grown, cut, dried and machined within ten miles of the site.
Thoughtful, sustainable detailing has been employed throughout. For example the cladding has a random width pattern to reduce unnecessary waste, with offcuts being used elsewhere, such as to make the front door.
The project has been recognised with multiple awards including the RSAW Welsh Architecture Building of the Year 2023 and an RIBA National Award 2023 given to buildings in recognition of their significant contribution to Architecture. Pen y Common was undertaken by both Nidus Architects and Rural Office. Rural Office undertook work through RIBA stages 1 to 3. Nidus Architects undertook work through RIBA Stages 3 to 7.